Peter Cowley, Managing Director “Internally we continue to maintain levels of investment in our factory and distribution departments.
In 2010/11 we have introduced new plant equipment. These are
- a second custom built rotating table shot blaster which doubles production capacity
- an additional digitally controlled CO2 filling rig to cope with increased product demand. This rig is a new concept that reduces manual handling and fills automatically.
- a fall back pumping system for CO2 filling to ensure gas filling requirements are met at all times
- a third delivery van to maintain all delivery expectations and to exceed them
